Project Updates | Callidus Engineering Skip to content
­

Project Updates

  • The Metalworks

     We are so excited to share that another phase of The Metalworks complex in Guelph, Ontario is wrapping up! The second of 3 high rise condo towers just finished construction, […]

    Countinue Reading >
  • Stubbe’s Office

    When Callidus was given the chance to work on a 40,000 sq ft. office building for Stubbe’s Precast, we jumped at the opportunity. Constructed using mostly precast concrete, this 3-storey […]

    Countinue Reading >
  • L’Arche Community Gathering Facility

    Callidus had the privilege to work on many community gathering spaces over the years. One of our most recent projects allowed us to design the mechanical & electrical systems for […]

    Countinue Reading >
  • UHN Image Guided Discovery Lab

    Callidus recently had the privilege of working on a new, cutting edge medical lab at Toronto General Hospital. This laboratory is used for researching new methods and procedures in diagnostic […]

    Countinue Reading >
  • Azure Apartment

    Callidus recently completed the design of a new 29 storey Residential Condominium in London, Ontario.  Containing 8 levels of parking, ground floor commercial space, 24 levels of residential suites, this building has a […]

    Countinue Reading >
  • Rouge Park Terraces

    Callidus recently completed the design of a new 6 storey Residential Condominium in Markham Ontario.  This Building was designed to target the affordable housing market, while focusing on urban integration.  […]

    Countinue Reading >
  • Bluewater Area Family Health Team Clinic

    With a 5,000 sq.ft. expansion, Bluewater Area Health Team recently opened their doors to provide family health options to their ever growing network of patients.  Callidus was given the opportunity […]

    Countinue Reading >
  • London Courthouse Lighting & Fixture Renewal

    The Project consisted of retrofitting existing lighting fixtures with new LED Lamps or LED Fixtures in order to reduce energy consumption costs. Click for project details

    Countinue Reading >
  • EMDC Program Back-up Generator Replacement

    Design and construction of new generator room in place of substation and 2 new diesel generators paralleled with existing generator with upgrades and new auto transfer switches to back up […]

    Countinue Reading >
  • Villas on Avon

    This project was a four storey luxury condo building totalling 51 residential units, ground floor amenity spaces and a shared parking garage below grade. Located close to retail amenities in […]

    Countinue Reading >