Callidus Engineering provided the design for the 570,000 square foot facility is a new distribution centre for Ford Canada. The new facility offers climate-controlled space, with over 80 dock-level doors and parking for more than 370 trailers. This facility is one of the two new distribution centres Ford has built in Ontario recently.