December 11th, 2017

Finkle Street Apartments

Completed in September 2017, the Finkle Street apartment added 119 condominium units to a growing residential development in Woodstock, Ontario. A dominant visual in a residential development made up of single-family [continue reading]

September 7th, 2017

Bluewater Area Family Health Team Clinic

Bluewater Area Family Health Team offer family health care in the town of Zurich, Ontario. In order to keep up with the demand of new patients and to ensure that [continue reading]

June 9th, 2017

London Courthouse Lighting & Fixture renewal

The Project consisted of a review and design for the upgrade of all existing lamps, ballasts, fixtures, fixture layouts and automatic lighting controls, including occupancy sensors, throughout the entire Courthouse [continue reading]

June 9th, 2017

EMDC Program Back-up Generator Replacement

Design and construction of new electrical service entrance switch board in new electrical room extension built within live outdoor substation enclosure. Removal of outdoor substation when new service connected. Design [continue reading]

March 14th, 2017

Renfrew OPP New Detachment

February 2017 saw the completion of the brand new 16,000 sqft Renfrew OPP Station.  The new station replaces two existing OPP facilities and consolidates them into a new modern and energy [continue reading]

March 14th, 2017

Villas on Avon

This brand new 4-storey luxury apartment condo building is bringing an additional 51 residential units to the growing community of Stratford.  The ground floor amenity space encompasses a professional exercise [continue reading]

February 27th, 2017

Westmount Golf Course – Hospitality

This project consisted of interior and exterior renovations and an addition to an existing golf course club house in Kitchener, ON. The Renovation included the dining room, a washroom expansion, [continue reading]

February 27th, 2017

Kettleby Camp & Outdoor Education

Callidus Engineering completed mechanical and electrical engineering for two new outdoor pools and change rooms, and equipment buildings and a new main lodge and kitchen facility.  New electrical distribution for [continue reading]

February 27th, 2017

Highland Golf & Country Club

The project consisted of a 3 level addition with 3,000 square feet of dining hall space, a 2,000 square foot second level outdoor patio and a 2,000 square foot underground [continue reading]

February 27th, 2017

FireRock Golf Club

The project consisted of a new 11,500 square foot clubhouse.  Facilities on the main floor of the clubhouse included: pro shop, dining room, commercial grade kitchen, washrooms and offices.  Lower [continue reading]

February 27th, 2017

Crediton Sportsplex

The project consisted of two phases.  Phase one was the complete renovation of the community centre including hall, washroom and kitchen.  Phase two consisted of removing existing ball diamond lighting [continue reading]

February 27th, 2017

Islington Golf Club

The project consisted of renovations to the main floor of the club house, completely redoing the entire 15,000 square feet. Facilities on the main floor included: pro shop, dining room, [continue reading]

February 27th, 2017

St. Joseph’s Ukrainian Catholic Church

The project consisted of a new 40,000 square foot church and community building. The site is located prominently at the corner of River Oaks Blvd. and Trafalgar Rd. in Oakville [continue reading]

February 27th, 2017

West Park Baptist Church

The project consisted of a new 55,000 square foot multi-purpose church facility located in northwest London, ON. The facility includes a 750 seat auditorium, Youth wing, Children’s wing, full size [continue reading]

February 27th, 2017

Centre Dufferin Recreational Complex

The project consisted of a new two storey addition onto the existing Centre Dufferin Recreation Complex, renovations to the existing hockey change rooms and other areas of the building. The [continue reading]

February 27th, 2017

L’Arche Community Gathering Facility

L'Arche is a community of individuals that share life together in a family-like setting. Many of these individuals have intellectual disabilities and require assistance to navigate their day to day [continue reading]

February 27th, 2017

London Optimist Sports Centre

The project consisted of a new 100,000 square foot indoor soccer complex that included full sized soccer field or four mini fields, full scale concession stand, walking track, change facilities [continue reading]

February 27th, 2017

NCC Multiplex BCAs

Review and assessment of the existing electrical and mechanical systems for 9 multi-unit residential and 2 commercial buildings in Arviat, NU; Rankin Inlet, NU; and, Baker Lake, NU. The information [continue reading]

February 27th, 2017

Chatham-Kent BCA

performed building condition assessments at 22 locations in the Chatham-Kent area. The purpose was to determine the present condition and remaining life expectancies of the component building systems, and provide [continue reading]

February 27th, 2017

Market Tower & AnnEx

Provided a single building condition assessment for two buildings located in downtown London. The one, a six storey structure named Market Tower and the second, a three storey structure called [continue reading]

February 27th, 2017

Kaiser Aluminum – Electrical Service Upgrades

This project’s scope was to design a new 3000 KVA electrical service with provisions for expansion to four 3000 KVA high voltage transformers.

February 27th, 2017

MOE Dis-entanglement

Callidus Engineering provided a detailed analysis of electrical distribution facilities at the (Ontario) Ministry of the Environment & Climate Change campus in Etobicoke, Ontario.

February 27th, 2017

Heritage Building Condition Assessments

Evaluation and report on existing conditions of plumbing, mechanical-HVAC, and electrical systems serving designated heritage buildings throughout Ontario. Preparations of opinions of cost to support reserve funds and heritage foundation [continue reading]

February 27th, 2017

GO Rail Operations Command Center

Callidus designed mechanical and electrical systems for the new command center in Union Station, Toronto. The command center is critical to the daily operations of GO Transit's rail fleet. The challenges of [continue reading]

February 27th, 2017

GO Malton – Rail Station Improvements

This project consisted of alterations to the north platform to accommodate 12 car trains, a new south platform complete with snow melt system and Mini-platform, a new west tunnel complete [continue reading]

February 27th, 2017

Forest Hill Street Lighting

Designed street lighting to the City of London STS standards for a residential subdivision in North central London.

February 27th, 2017

GO Square One Park & Ride

The existing 2,500 square foot GO Square One Agency building was demolished and upgraded to a full Bus Terminal Station, to help alleviate long line ups for ticket purchasers and [continue reading]

February 27th, 2017

GO Sheppard

Construction of a new rail and subway terminal at Sheppard Avenue West & Bakersfield Street. GO Transit is a tenant within the TTC owned terminal which is comprised of two [continue reading]

February 27th, 2017

Waterloo Aviation Co Hanger

The project consisted of new construction of a 17,000 square foot private aircraft hangar facility including 2,100 square foot of ancillary spaces for office area, boardroom, public and private washrooms, [continue reading]

February 27th, 2017

Kelnar Pilatus Aircraft Centre

Project consisted of new construction of an aircraft hanger and service facility for the storage and repair of the Pilatus aircraft. Project included administration offices on two levels at the [continue reading]

February 27th, 2017

Windsor VIA Rail Station

The project was the new construction of a single storey VIA rail station. The project features a curved translucent roof structure for a large portion of the roof area. The [continue reading]

February 27th, 2017

GO King City – Rail Station Improvements

This project consisted of new station construction for the King City terminal. Station features included man ticket sales, communications and electrical room, accessible public washrooms, and waiting area.

February 27th, 2017

Elgin Middlesex Detention Centre Generator Study

The project consisted of a feasibility study to explore generator replacement options and to evaluate the existing switchboard and transfer switch at the Elgin Middlesex Detention Center. The report evaluated [continue reading]

February 27th, 2017

Elgin Middlesex Detention Centre Chiller Replacement

The project involved the replacement of two-300 ton chillers and one cooling tower. The replacement was required because of the phase-out of R-11. The replacement chillers were new magnetic bearing [continue reading]

February 27th, 2017

Virtual High School

This previous historic hotel in Bayfield was entirely stripped down to the structure and raised a storey to create a full height basement creating 8,100 sq. ft. of usable space. [continue reading]

February 27th, 2017

Ontario Police College (OPC)

The project involved the removal of the existing absorption chiller and replacement with a new 700 ton magnetic bearing chiller. The new chiller was set up as the primary cooling [continue reading]

February 27th, 2017

Teviotdale OPP New Detachment

New 18,300 sq ft police station to serve the residents in the County of Wellington. The facility was designed with a detention area, offices, locker rooms, sally port and fitness [continue reading]

February 27th, 2017

Fergus OPP New Detachment

The project was the construction of a new, single storey OPP detachment for The County of Wellington. The facility was required to be designed to incorporate green technologies for the [continue reading]

February 27th, 2017

Kerwood Fire Hall

Designed a new 5600 square foot wood framed fire hall which included four fire truck bays, offices, maintenance room, washrooms, kitchen and training room.

February 26th, 2017

Norfolk County Public Library

Project consists of renovations to the existing Port Dover Composite Highschool technology wing to the Norfolk County Public Library.

February 26th, 2017

Robarts School BAS & Boiler Plant Upgrades

The Robarts School for the Deaf is a Ministry of Education run school that provides education and resources for the hearing impaired. The facility includes residences for out of town [continue reading]

February 24th, 2017

University of Western Ontario McIntosh Gallery

The purpose of this project was to upgrade mechanical HVAC and electrical lighting to increase energy efficiency, and provide a higher level of control. It was important to have accurate [continue reading]

February 24th, 2017

Woodstock Art Gallery

Existing four storey building to be renovated to accommodate the existing Woodstock Art Gallery

February 24th, 2017

Elgin Middlesex Detention Centre Fire Alarm Replacement

As the Prime Consultant, Callidus Engineering was the main point of contact with the facility maintenance staff and the project management for the design requirements. We first completed an investigation [continue reading]

February 24th, 2017

Brose Canada Inc.

Brose is a partner of the international automotive industry, supplying about 80 automotive brands and more than 30 suppliers of electric motors, mechatronic systems for vehicle doors, tailgates and seat [continue reading]

February 24th, 2017

DaVinci Light Industrial Facility – Offices

The DaVinci Industrial facility is a new 300,000 square foot light industrial facility which includes 50,000 square foot of office space.  The building required an energy efficient design to meet [continue reading]

February 24th, 2017

Pine River Cheese

The project consisted of a complete restoration of a 32,000 square foot cheese factory south of Kincardine, after the building was destroyed by a fire. As a food production facility, [continue reading]

February 24th, 2017

Formet Industries

Callidus Engineering has worked with Formet Industries to provide electrical and mechanical engineering design for upgrades and renovations to the existing heavy automotive manufacturing facility. Callidus has designed ventilation upgrades [continue reading]

February 24th, 2017

Kaiser Aluminum – Electrical Service Upgrades

This project’s scope was to design a new 3000 KVA electrical service with provisions for expansion to four 3000 KVA high voltage transformers.

February 24th, 2017

Diamond Aircraft

Renovations to replace the electrical systems of the existing facility to support a state of the art aircraft manufacturing facility including associated high hazard spaces and 20,000 square foot administration [continue reading]